Visual Materials
Hoover Dam ceremony, aerial views, etc
You might also be interested in
Image not available
Hoover Dam
Visual Materials
Hoover Dam, ceremony, Lake Mead, aerials of Colorado River, Transmission Towers, Generator floor, Transformers, assembly of units.
photCL SCE 13 - vol 111
Image not available
Big Creek: Powerhouse No. 1 (part 1)
Visual Materials
Photographs of Powerhouse No. 1, Part One. Views include generator floor, exterior with extension, close-up of Powerhouse 1, generator repairs, Unit 3 penstock construction, riveting penstock, transformer rack, substation, exterior before extension, extension construction, hoist house interior, assembly of Units 3 and 4, change to 220 kV transformers.
photCL SCE
Image not available
Big Creek: Powerhouse No. 3 (part 2)
Visual Materials
Photographs of Powerhouse No. 3, Part 2. Views of generator floor with Units 1, 2, and 3 installed, excavation of Powerhouse 3 site with steam shovel and high pressure water gun, Switchyard construction, turbine parts, battery room, construction of penstocks, turbine assembly. Also penstock construction for Unit 3, Powerhouse No. 1 .
photCL SCE
Image not available
Kern River No. 1
Visual Materials
Kern River No. 1, including site for Democrat Dam; Dam construction and drainage tower; intake; dam spilling; Construction at Camp 4; Kern River Canyon, hospital, tunnel workers, tunnel portal, concrete mixing plant, concrete flume, tunnel automobiles; Camp 1, penstock construction, branch pipes, Powerhouse construction, machinery transport to site, assembly of units in powerhouse, placing "Y" piece, main water valve needle, exciter needle, impulse wheel and buckets, transformers, tailrace construction, original spillway, towers and erect insulators, transmission line; Tejon, Castaic and Fernando Substations, Los Angeles No. 3 Steam Plant.
photCL SCE
Image not available
Big Creek: Powerhouse No. 3 (part 1)
Visual Materials
Photographs of Powerhouse No. 3, Part 1. Construction photographs of first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.
photCL SCE
Image not available
California Electric Power Corp. - Nevada-California Electric Corp.: Hoover Dam line construction
Visual Materials
Photographic map of Nevada-California Electric Corporation Transmission Line from Victorville to Boulder (Hoover) Dam site with profiles, tower drawings, as well as photographs of construction camps, tower installations, building tower bases, hanging insulators, stringing conductors, splicing conductor, switching towers, angle towers, angle "AP" type towers, dead end towers, and the Hoover Dam Substation.
photCL SCE