Kern River No. 1
You might also be interested in
Image not available
Kern River Project; Kings River
Visual Materials
Kings River Powerhouse No. 1 and cottages, headworks, Lucas Creek Flume, Cow Creek flume, Borel Powerhouse with 5 penstocks, Isabella (1907); Kings River No. 1 Water Appropriation Notice, Kings River No. 2 - Camp near Mill Creek, posted notice, material storage, warehouse at Tunnel 9; Kings River No. 3 - South Fork Gorge and Intake site, Crown Valley, Little Brush Creek, construction road, Water Appropriation Notice; Kings River No. 4 - Tehachapi Basin, lumber yards, water appropriation notice at intake site, P.D. Plant and spillway at mouth of Kern Canyon.
photCL SCE
Image not available
Big Creek projects and Colorado River survey
Visual Materials
Big Creek Project - Penstock sections, Powerhouse No. 1 (Unit 4 installation), Powerhouse No. 2, Florence Lake Dam construction (framing for concrete), Camp Hospitals, Cookhouse, Warehouse, Recreation Hall, Mess Halls, tunnel excavations, Construction Camps (No. 21, No. 64, No. 72, No. 73); Photographs of Colorado River Survey of Sierra Watershed, including Evolution Lake, Garnet Lake, Wanda Lake, Thousand Island Lake, Heart Lake, Desolation Lake, N. Goddard Lake, and Sapphire Lake; Kern River No. 1; Transmission tower construction; [Big Bear dam construction]; Huntington Lake Dam 1; Shaver Dam construction.
photCL SCE
Image not available
Kern River near Kernville; Pacific Light and Power Co
Visual Materials
Kern River near Kernville showing intake of Pacific Light and Power Co. for Borel Powerhouse; gauging bridge at Pacific Light & Power powerhouse site; Kern River No. 1 site including Edison Electric Company power plant 1, penstock site for Pacific Light and Power Co, site for Edison Electric penstock and diversion, location of Edison Electric tunnels, tunnel "Upper 18," and Democrat Springs gauging station.
photCL SCE
Image not available
Big Creek construction
Visual Materials
Big Creek, including tunnel excavation, Bear Dam, Mono Dam, Mono-Bear siphon construction; Florence Lake Dam construction, Ward Tunnel spilling; Shaver Lake Dam construction, concrete mixing plant, first concrete, screening plant, Quarry, Powerhouse 2A construction, Stevenson Test Dam construction; Gauging San Joaquin River, Herminghaus Ranch.
photCL SCE

Kern River No. 3
Visual Materials
Kern River No. 3 - Concrete mixing plant [at camp above Fairview dam site.]
photCL SCE 02 - 05251
Image not available
Big Creek projects and Colorado River survey
Visual Materials
Photographs of 1922 Colorado River Survey with typescript captions by "E.C.L.", including Hall's Crossing, Rock Island, Hole in the Wall, San Juan River, San Juan Dam site, Aztec Creek, Rainbow Natural Bridge, Girand Dam site, Sentinel Rock Dam site, Boulder Canyon Dam site, Black Canyon Dam site, Pierce's Ferry, Grand Wash Canyon, Hualapai Dam site, Virgin Canyon Dam site, Callville Dam site, El Dorado Dam site; Big Creek projects include Huntington Lake Dam 1 fourth unit of Powerhouse 1, Florence Lake Dam construction, tunnel construction, and diversion dam at Camp 63.
photCL SCE