Visual Materials
Long Beach Steam Station construction, Big Creek, Mill Creek, Santa Ana River, Big Bear Lake
You might also be interested in
Image not available
Borel, Kern River No. 3, Santa Ana River No. 1, Mill Creek, PL&P construction photos from 1903, and Bear Valley Dam (Union Power Co.)
Visual Materials
Photographs of Borel flume and canal work (mostly un-numbered), Borel headworks, Borel Powerhouse, Kern River No. 3 construction, Santa Ana River No. 1 powerhouse, Santa Ana River 1 intake, Santa Ana River 1 settling basin, Santa Ana River No. 2 powerhouse, Mill Creek No. 1 Powerhouse, Mill Creek No. 3 intake, Mill Creek cottages, Santa Ana River No. 3 flume construction, Pacific Light & Power construction Photographs from 1903, Bear Valley Dam (Union Power Co.), Mill Creek 2 and 3 Powerhouse, Santa Ana River flood damage.
photCL SCE
Image not available
Big Creek construction, Kern River, Redondo Steam Station, etc
Visual Materials
Azusa Line; Big Creek construction - Dam 2, towers, Powerhouse 2, Richgrove Patrol Sta.; Borel change to Pelton-Francis horizontal turbines, break in canal, Bodfish Flume, repairs at Schoolhouse Cut, Profanity Flume; San Bernardino "C" Street Substation, Long Beach Steam Plant, Santa Ana River 2; Fillmore Substation; PLandP trucks and wagons; Huntington Beach Substation; East Kern Line; Kern Canal, settling basin, Borel Powerhouse; Mentone - siphon, flume break, fish screen, intake; L.A. City Power Dev. Plant 1; Pedley Powerhouse - break in canal; Redondo Steam Plant; Sierra Powerhouse; Stone Castle, Vernon Substation, Santa Paula Substation, Monolith Substation, and Eagle Rock Substation.
photCL SCE
Image not available
Big Creek, Mill Creek, Kern River, etc
Visual Materials
Big Creek rivers and streams; Powerhouse 2 interior; Cascada general office; Huntington Lake Lodge, Huntington Lake and Dam 1, Shaver Lake, Powerhouse No. 2, Powerhouse No. 8 interior and exterior, Dam 6 and Intake 3, Powerhouse No. 3; Vestal, Eagle Rock Substation, Laguna Bell Substation; Mill Creek No. 1 exterior and interior; Kern River No. 3 exterior and interior, Kern River No. 1 interior; Long Beach Steam Plant No. 1; Camp on Eagle-Bell Line near San Gabriel; Edison Executive portraits; and Edison General Office at 3rd and Broadway, Los Angeles.
photCL SCE
Image not available
Big Creek projects and Colorado River survey
Visual Materials
Big Creek Project - Penstock sections, Powerhouse No. 1 (Unit 4 installation), Powerhouse No. 2, Florence Lake Dam construction (framing for concrete), Camp Hospitals, Cookhouse, Warehouse, Recreation Hall, Mess Halls, tunnel excavations, Construction Camps (No. 21, No. 64, No. 72, No. 73); Photographs of Colorado River Survey of Sierra Watershed, including Evolution Lake, Garnet Lake, Wanda Lake, Thousand Island Lake, Heart Lake, Desolation Lake, N. Goddard Lake, and Sapphire Lake; Kern River No. 1; Transmission tower construction; [Big Bear dam construction]; Huntington Lake Dam 1; Shaver Dam construction.
photCL SCE
Image not available
Big Creek construction
Visual Materials
Big Creek, including tunnel excavation, Bear Dam, Mono Dam, Mono-Bear siphon construction; Florence Lake Dam construction, Ward Tunnel spilling; Shaver Lake Dam construction, concrete mixing plant, first concrete, screening plant, Quarry, Powerhouse 2A construction, Stevenson Test Dam construction; Gauging San Joaquin River, Herminghaus Ranch.
photCL SCE
Image not available
Early construction at Big Creek, Tule River and Kern River
Visual Materials
Album compiled by Edison employee containing professional and amateur photographs of Borel interior with Pelton-Francis turbines; Excavation for Big Creek Powerhouse No. 2; Huntington Lake construction for Trestle Dam 1, Dam 2; start of construction at Powerhouse No. 1 and Dam 4, installation of equipment at Powerhouse 1, penstock assembly, completion of Dam 4; construction of Big Creek Powerhouse 2; construction of Powerhouse No. 8, constructing road to Powerhouse 3, and Tule Powerhouse.
photCL SCE