Skip to content

Visual Materials

Big Creek - Powerhouse #2 & 2a (part 1)

1 of 81


You might also be interested in

  • Big Creek - Powerhouse #2 & 2a (part 3)

    Big Creek - Powerhouse #2 & 2a (part 3)

    Visual Materials

    Big Creek - Powerhouse #2 & 2a (part 3) [Construction at Powerhouse 2A, manufacturing photos showing the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at PH 2A.]

    photCL SCE 13 - vol 031

  • Image not available

    Big Creek: Powerhouse No. 2 and 2a (part 1)

    Visual Materials

    Photographs of Powerhouse 2 and 2A, Part One. Construction photographs of Powerhouse 2 and 2A.

    photCL SCE

  • Big Creek Powerhouse 2 & 2a with 1 variant

    Big Creek Powerhouse 2 & 2a with 1 variant

    Visual Materials

    [Big Creek Powerhouse 2 & 2a] [with 1 variant]

    photCL SCE 06 - 70124

  • Big Creek Powerhouse #2 & 2A

    Big Creek Powerhouse #2 & 2A

    Visual Materials

    Big Creek Powerhouse #2 & 2A [with 1 variant]

    photCL SCE 06 - 70473

  • Big Creek - Powerhouse #3 (part 2)

    Big Creek - Powerhouse #3 (part 2)

    Visual Materials

    Big Creek - Powerhouse #3 (part 2) [Generator floor with Units 1, 2, & 3 installed, excavation of Powerhouse 3 site with steam shovel and high pressure water gun, Switchyard construction, turbine parts, battery room, construction of penstocks, turbine assembly. Powerhouse #1 - penstock construction for Unit 3.]

    photCL SCE 13 - vol 033

  • Big Creek - Powerhouse #2, & 2a - maintenance

    Big Creek - Powerhouse #2, & 2a - maintenance

    Visual Materials

    Big Creek - Powerhouse #2, & 2a - maintenance [Exterior shots of PH #2, full shot of PH 2 & 2A, generator floor in PH 2, Unit 6 bucket failure (PH2) with close-ups of damage, damage to overhead crane from flying #10 bucket, PH 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gatehouse, penstock "Y"s, rotor installation, PH2 Unit 3 winding failure, broken buckets]

    photCL SCE 13 - vol 044