Visual Materials
Boulder-Chino Transmission Line (2nd)
You might also be interested in

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Reeling in Pulling line with reel truck at M1-T1
photCL SCE 02 - 23240

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Completed first and 2nd Boulder Lines M1-T1
photCL SCE 02 - 23243

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Guard Poles for pulling cables over A.T.&S.F. Railroad near M220-T1. [A steam locomotive is switching track between the guard poles].
photCL SCE 02 - 23545

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Tensioning conductor at M199-T1.
photCL SCE 02 - 23543

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Installing bird guards at M113-T1
photCL SCE 02 - 23270

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Erecting tower by hand at location M90-T1.
photCL SCE 02 - 23255